FIRST TRIAL RUN CONDUCTED ON NOAPARA-JAI HIND (BIMANBANDAR) STRETCH OF YELLOW LINE METRO.

The first trial run on Noapara- Jai Hind   stretch of Yellow Line has been conducted successfully today.This trial run started from Noapara at 4.20 pm with Rake No. MR 407.  Shri Devindar Kumar, Chief Engineer, Construction, Metro Railway, Senior Officers and staff of Metro Railway were present during this trial run. Shri Kumar offered puja at Dum Dum Cantonment station once the rake reached there.

This trial run was aimed to check whether all parameters of this stretch of 6.25km are ready and the Metro Rake can run safely. This stretch once commissioned would be a revolutionary step in providing a modern transport system to the people of Kolkata and suburbs to reach Airport.

Noapara Metro station in this stretch will be the passenger interchanging point in between Blue Line and Yellow Line.